Replacing an old house on a steep or clifftop block is a knockdown rebuild with extra layers: the ground, the access, the fire and the weather. Each one is manageable if it is planned before demolition.

By Keiron Moore, Founder and Managing Director, CKS ProjectsPublished Updated 3 min read

Many of the escarpment's older houses sit on blocks with the best views in the region and the hardest ground. Replacing them is common, and the general process is the same as anywhere (the knockdown rebuild process sets it out). This page covers what the escarpment adds.

Why rebuild rather than renovate on the escarpment?

Older escarpment houses were often built before current geotechnical, stormwater and bushfire standards. Renovating keeps their footings, drainage and construction; rebuilding lets the new house be designed around the ground, the fire risk and the view from the start.

What extra layers does a clifftop or escarpment rebuild have?

  • Ground: a geotechnical report under Wollongong DCP Chapter E12, and Chapter B6 inside the escarpment precincts. See geotechnical reports.
  • Bushfire: much of the escarpment is bush fire prone land. The new house gets a Bushfire Attack Level (BAL-LOW, 12.5, 19, 29, 40 or FZ) and must meet Planning for Bush Fire Protection 2019, which can affect the approval pathway, materials and landscaping.
  • Stormwater: water has to reach a legal point of discharge without being concentrated onto the slope below.
  • Coastal exposure: salt-laden wind on clifftop sites changes the specification of metals, fixings and finishes.
  • Mine subsidence: some Illawarra land is near old coal workings; check the mapping.

How is demolition different on a slope?

Machinery and waste trucks need somewhere safe to stand, and on a steep or narrow block that may be the street. The demolition sequence also has to avoid destabilising the slope: removing an old house can remove the structure that was holding up a bank. The geotechnical engineer should see the demolition plan, not just the new design.

What does a clifftop rebuild look like in practice?

Wombarra Clifftops is a knockdown rebuild I built on a clifftop slip area close to a main road. The old house came down and a split-level home went up in its place, with the engineering, stormwater and slope resolved in the design. It won the Contract Homes $1.9 Million to $2 Million category at the Master Builders NSW 2026 Southern Regions Excellence in Building Awards, and the Illawarra Mercury covered it in August 2026. Other escarpment builds are on the projects page.

Where should a clifftop rebuild start?

  1. Survey, geotechnical report and bushfire assessment, before design.
  2. A design that follows the slope: often a split-level home.
  3. A demolition and access plan the engineer has seen.
  4. A fixed price based on all of the above.

Not every builder takes on these sites. Look for one with a track record of knockdown rebuilds on difficult Illawarra blocks, and ask to see a comparable site they have finished.

Sources

Checked on 25 October 2026.

General information from a builder, not engineering or planning advice. Your geotechnical engineer, structural engineer and certifier decide what your site needs.

Questions

Clifftop rebuilds, plainly answered

Can you knock down and rebuild on a clifftop block in the Illawarra?

Yes. Keiron Moore says it is done regularly, but it needs a geotechnical report, a bushfire assessment, a stormwater design and a demolition plan the engineer has reviewed before work starts.

What extra reports does an escarpment rebuild need?

Keiron Moore lists a geotechnical report under Wollongong DCP Chapter E12 (and Chapter B6 inside the escarpment precincts), a bushfire assessment against Planning for Bush Fire Protection 2019, and a stormwater design.

What are the Bushfire Attack Levels?

Keiron Moore notes the six levels are BAL-LOW, BAL-12.5, BAL-19, BAL-29, BAL-40 and BAL-FZ, and the level decides the construction requirements for the new house.

What is Wombarra Clifftops?

Keiron Moore describes Wombarra Clifftops as a split-level knockdown rebuild on a clifftop slip area near a main road, which won the Contract Homes $1.9 Million to $2 Million category at the Master Builders NSW 2026 Southern Regions awards.

Find out what your block will carry.

45 minutes on your site with Keiron Moore. No fee, no obligation, and a straight answer, even if it's “don't build that here.”

Call Keiron on 0416 978 669 Email info@cksprojects.com.au

Keiron does every assessment himself. Mon–Fri 8.00am–4.30pm.