Geotechnical reports for escarpment blocks: what they cover and when Wollongong requires one

On the escarpment, the ground decides more of the house than the floor plan does. The geotechnical report is how you find out what the ground will allow, and it is cheapest when it comes first.

By Keiron Moore, Founder and Managing Director, CKS ProjectsPublished Updated 3 min read

The escarpment guide describes the geology under the Illawarra's steep suburbs: rock, clay and old landslip material. A geotechnical report is the document that turns that general picture into answers for one block.

What is a geotechnical report?

It is an engineer's assessment of the ground under a proposed building: what the soil and rock are, how stable the slope is, where water sits, and what footings, excavation and retaining the site can take. On escarpment land it often includes a formal assessment of landslide risk.

What does a geotechnical report cover?

  • Boreholes or test pits, and a description of the soil and rock profile
  • Depth to rock, and groundwater observations
  • Slope stability and landslide risk, assessed against the Australian Geomechanics Society guidelines
  • A site classification for footing design
  • Recommendations on footings, excavation depth, retaining, batters and drainage
  • Conditions the design and construction must follow, such as inspections during excavation

When does Wollongong require a geotechnical report?

Wollongong's Development Control Plan 2009 has a chapter for it: Chapter E12, Geotechnical Assessment of Slope Instability, which adopts the Australian Geomechanics Society's 2007 landslide risk management guidelines. Land within the escarpment precincts is also covered by Chapter B6, Development in the Illawarra Escarpment, which requires a geotechnical report with development applications there. If your block is steep, mapped, or near a known slip, assume the report will be needed and get it early.

What is site classification?

Every house site in Australia is classified for footing design. The classes are A (sand and rock), S, M and H (increasingly reactive clays), E (extremely reactive) and P (problem sites). Many escarpment blocks are class P because of slope, fill or landslip risk, which means the footings must be designed by an engineer rather than taken from standard tables.

Why should the report come before the design?

Because it can change everything the designer draws: where the house sits, how deep it can cut, whether the floors are on slab or piers, and how high the retaining walls can be. A design drawn first and checked later often has to be redrawn. The report also lets the builder price the footings, excavation and retaining with real information instead of allowances. The options it leads to are compared in suspended slab, piers or cut and fill, and the cost effects in sloping blocks: what drives the cost.

That is why it is worth working with builders who start every steep-site design from the geotechnical report: the price you sign is then based on the ground you actually have. If your block is also near old coal workings, check mine subsidence as well.

Sources

Checked on 25 October 2026.

General information from a builder, not engineering or planning advice. Your geotechnical engineer, structural engineer and certifier decide what your site needs.

Questions

Geotechnical reports, plainly answered

What does a geotechnical report include?

Keiron Moore says it covers the soil and rock profile from boreholes or test pits, depth to rock, groundwater, slope stability and landslide risk, a site classification, and recommendations for footings, excavation, retaining and drainage.

When is a geotechnical report required in Wollongong?

Keiron Moore explains that Wollongong DCP 2009 Chapter E12 covers geotechnical assessment of slope instability, and Chapter B6 requires a geotechnical report with development applications in the Illawarra Escarpment precincts.

What is a class P site?

Keiron Moore describes class P as a problem site, often because of slope, fill or landslip risk, where footings must be designed by an engineer rather than taken from standard tables.

Should I get a geotechnical report before buying or designing?

Keiron Moore recommends getting it before design, because it decides where the house can sit, how deep it can cut and what footings and retaining are needed.

Find out what your block will carry.

45 minutes on your site with Keiron Moore. No fee, no obligation, and a straight answer, even if it's “don't build that here.”

Call Keiron on 0416 978 669 Email info@cksprojects.com.au

Keiron does every assessment himself. Mon–Fri 8.00am–4.30pm.